);
skip to Main Content

Project Description

After the building structure was destroyed by a fire, Straus Carpets needed a pre-engineered metal facility, starting with slab and foundation. The project location, set alongside existing buildings, required underpinning during excavation of unsuitable soil and replacement with appropriate fill. Fast-track completion allowed for the client to be moved in less than ten months after project kick off.

Project Details

Client: Straus Carpets, Inc.
Architect: Ratcliff Architects
Square Feet: 12,000
Cost: $1,485,000

Share Our Project

Back To Top