Interior tenant improvement to existing R&D industrial / office tenant space on the first floor level. Upgraded HVAC, lighting, electrical, fire protections systems and restroom ADA requirements.
Market Sector(s)
							
						
																											126,800 SF
																																						
												Pleasanton, CA
													
													Exterior and interior tenant improvements to the general office, manufacturing, warehouse, etc. 
												
																											20,000 SF
																																						
												Fremont, CA
													
													Ongoing multiple tenant improvement and clean room installation projects for Seagate Fremont campus. 
												Media Coverage
												
September 25, 2019
													
													Advanced, cost-effective lidar technology for advanced driver assistance systems (ADAS) and autonomy, can protect pedestrians, assist drivers and save lives.
													Velodyne Lidar
													
												Velodyne Lidar (San Jose, CA)
				Interior tenant improvement to existing R&D industrial / office tenant space on the first floor level. 
									
							
