);
skip to Main Content

Project Description

Fast-track – Design-Build high tech facility for owner-occupied manufacturing flexible circuit boards. Noteworthy features include repurposed structure, Hazardous Class 4 construction, clean rooms, specialty labs, IT and HQ offices.

H4 Plating and chemical storage facilities feature raised Fibergrate flooring systems, secondary containment regions and trenches with chemical resistant coatings supported by infrastructure upgrades including scrubbed exhaust, trapezed double-contained process piping of acids and hazmat, CDA, DI water, waste recovery and storage tanks, emergency/back-up generator, chemically resistant exterior equipment pads and pits, anchoring and connection of relocated and new equipment and tools.

Multiple phases of tool and personnel migrations were conducted throughout the duration of the project, completed ahead of schedule and on budget.

Project Details

Client: Lenthor Engineering, Inc.
Architect: WHL Architects
Square Feet: 55,000
Cost: $5,000,000

Share Our Project

SILICON VALLEY REGION

TEAMWRKX Construction, Inc.
1855 Park Avenue
San Jose, CA 95126

T: 408.287.2700
F: 408.287.2800
E: info@teamwrkx.com

LOS ANGELES REGION

TEAMWRKX Construction, Inc.
800 W. Martin Luther King Jr. Blvd.
Los Angeles, CA 90037

T: 310.220.2345
F: 408.287.2800
E: info@teamwrkx.com

LICENSES

CALIFORNIA:
TEAMWRKX: 841440
TEAMWRKX Construction: 907598
TEAMWRKX Facilities: 1017087

OREGON:
TEAMWRKX Construction: 220616

connect with us!

0
Projects Completed
Back To Top